The Egg & I
Challenge
Client called us on an emergent basis, due to the restaurant's need to continue with service:
This is a water vault that is used to separate grease and water from the restaurant's drainage system inside of a South Jordan, Utah strip-mall. The vault had settled 1+", allowing the water to pool inside the vault causing pooling and no drainage capability.
Solution
The lid to the vault was removed and four injection holes were then drilled in each corner. We proceeded to raise the settled vault side up 1" and void-filled the remainder of the vault.
Project Summary
Joshua Shaw: Project Manager, Davenport Foundation Repair